Technical guidelines for connection of power generating plants

Power generating plants must comply with the technical requirements which the DSOs and Energinet have published in accordance with the Commission Regulation (EU) 2016/631 – Requirements for Generators (RfG) and The Danish Electricity Supply Act (Elforsyningsloven). Green Power Denmark has written guidelines which gather all of the requirements for connecting power generating plants to Danish distribution networks. The guidelines can be found below.

Technical guidelines

Annex’ for guide for connection of power generation plants to the low voltage grid

Annex’ for guide for connection of power generation plants to the medium- and high voltage grid 

Declaration of Conformity

The Declaration of Conformity aims to confirm that the applicant is familiar with Energinet's validation method for RoCoF and that the unit complies with the requirement for Rate of Change of Frequency robustness (RoCoF)

 Find this information in Danish

Landvind og solceller

Produktionsanlæg skal overholde tekniske krav for at blive tilsluttet til distributionsnettet. Dette er for at sikre en høj kvalitet i leveringen af elektricitet til alle kunder.